Saturday, August 19, 2006
Driveway
The earth-mover guy came in for the last two days to grade & gravel the driveway. He used a type of rock mixture that starts out loose, but eventually packs down with wear & moisture to form a fairly hard surface. There's a big horseshoe-shaped drive in the front, as well as the drive that runs around back to the garage. It took six truckloads! (Too big to get a proper picture of the whole thing.)
Subscribe to:
Posts (Atom)